16 February 2019

Large-scale construction project

MASS MEDIA ABOUT US to the news

In 2018 on-site storage capacity of the three grain elevators belonging to Alebor Group  namely, Voronovytske, Khrystynivske and Chesne Grain-Collecting Stations, was increased by 112,000 tons. Since now the total volume of silo capacities is 315,000 tons.

It should be noted, that during MY2018-2019 these grain-collecting stations have transshipped over 800,000 tons of grain totally.

Read the details about the stages of powerful construction at all the elevators of Alebor Group of Companies in special project: Birth of grain elevators. New capacities. Alebor Group

other news:

EVENTS 10 April

By joint efforts – to profitability

news image
INTERVIEW 26 March

Oleksiy Tsurkan: Lack of railway transport encourages expanding of grain storage facilities

news image
MASS MEDIA ABOUT US 22 March

Alebor Group told about HACCP system silo infrastructure requirements

news image
CONGRATULATIONS 8 March

Happy holiday, charming women!

news image
MASS MEDIA ABOUT US 19 February

Sharing experience: International standards as performance quality assurance

news image
MASS MEDIA ABOUT US 15 February

HACCP procedures application at silo facilities of Alebor Group

news image
INTERVIEW 11 February

Oleksiy Tsurkan: The basis of energy efficiency is careful planning

news image
MASS MEDIA ABOUT US 6 February

Oleksiy Tsurkan: Without newly added capacities grain elevators of Alebor Group would have flunked this season

news image
MASS MEDIA ABOUT US 6 February

Alebor Group is listed as one of the most dynamically developing companies

news image